The Assignment:
- Project #2 instructions (.doc)
- Project #2 power point instructions (.pptx)
- Complete Step-by-Step Example
You have been asked to consult on the lighting
for a children’s play area on a cruise ship.
Space to include:
Space to include:
- Entrance and Exit (you determine where, cannot be along the party wall)
- Video Gaming Area (400 sf)
- Includes (4) gaming console areas, each with two chair, a television, and a small shelving (can be part of 100 lf of shelving requirement below) to hold console (video game unit)
- Board Game Area (150 sf)
- Board game area to consist of (2) large tables for use by children for puzzles, board games, etc. Chairs should also be provided, ~4 per table.
- Game storage (~100 lineal feet)
- This can be incorporated into the individual areas, or can be its’ own area. You need to provide places for the games, movies and other activities to be stored when not in use.
- Snack/Treat Area (200 sf)
- You need to provide a small sink for washing hands/preparing food.
- A small table and chairs for 6-8 children
- Be mindful of the plumbing /mechanical chase, the sink must be within 10 lineal feet of one of the plumbing chases
- Unisex Bathroom (50 sf)
- Small bathroom with a toilet and sink
- Restroom must also be within 10 lineal feet of the plumbing chase
You have 3 weeks to complete a package drawing
consisting of basic floor plan (provided) furniture plan and lighting plan. You
must also include (1) detail drawing showing one aspect of the lighting (i.e.
cove lighting, or under cabinet lighting, or back lighting of accent
panel). Plan set must include lighting
legend and lighting schedule.
Ceiling height is 10’-0” high at the highest
point. Feel free to add any coffers,
vaults, etc.
For each room you are to select appropriate fixtures
and lamps (with corresponding cut sheets), and provide the calculations (using
any of the methods learned in week 2) for the spaces. Show all math. Also put together a Lighting Design Criteria
Matrix for each room in the daycare, (table to be provided, student to ensure
all information is filled in, formatting can be modified as needed). Students to compile all documents into a .pdf
file and upload to Canvas.
To help make sure your project is moving along, I have intermediate due dates for a preliminary furniture plan (due Sept 27) and a preliminary lighting plan (due October4). The final project is due October 11
To help make sure your project is moving along, I have intermediate due dates for a preliminary furniture plan (due Sept 27) and a preliminary lighting plan (due October4). The final project is due October 11
Assignment Rubric
Potential Points
|
|
Lighting Criteria Matrix (includes
all rooms)
|
30
|
Floor Plan
|
15
|
Preliminary Floor Plan (due
September 27)
|
5
|
Final Furniture Plan
|
15
|
Preliminary Lighting Plan (due
October 4)
|
5
|
Lighting Plan
|
15
|
Detail Drawing
|
15
|
Lighting Legend (on Lighting Plan)
|
15
|
Lighting Schedule (on Lighting Plan)
|
15
|
Cut Sheets to correlate to
fixtures/lamps selected
|
30
|
Calculations included for each room
|
30
|
Overall Presentation Quality
|
10
|
Total
|
200
|
The files:
Examples of Graded Assignments: